Part 1 can be found here.
Demolition well underway. |
Several hundred spectators gathered to watch the main event.
Getting close the main event.
In for closer look. |
There she goes, the main event as the dome topples |
Hundreds gathered for this and huge cheers erupted from the crowd. The digger driver gave a huge thumbs up in acknowledgment.
With the fall of last second floor wall, the day's show was over just after 2:00 pm.
The only bit of rubble top fall outside there footprint of the building about to hit the deck. |
The remains were removed a few days later as there site was levelled. A great job by the contractors, Paul Smith Earthmoving.
Return to Part 1
Return to Part 1
No comments:
Post a Comment